Question: How long does it to take to install a typical forced air furnace? (using existing ductwork; utility connections already in place)
Top Answer (47% of 17 votes): 4-6 hours.

Answer: 4-6 hours
Explanation: Half a day is a typicall install on a furnace, horzantal or vertical.
Kair
Answer: 4-6 hours
Explanation: If done correctly it should 4 to 6 hours it's not a race you should be more concerned with the way it's being installed is it according to manufacture spec's.
Arizona's Best Heating & AC, Inc.
Answer: 6-8 hours
Explanation: Depends on location
HVAC and More
ProMatcher
Answer: 4-6 hours
Explanation: All jobs are differant and take different amounts of time.
Dr Heat & Cool Comfort Experts
Get Free Quotes Today!
Find Local Pros
Free Forced Air Furnace Installation Cost Estimates

Related Questions

How Much Does It Cost to Install a New Gas Furnace?

Are furnace filters recyclable?Top answer: Never

True or false: It is typically cheaper to install a gas furnace than an electric furnace.Top answer: False

Can a furnace leak carbon monoxide?Top answer: Yes

What is the most popular brand of furnace that you install?Top answer: Other



Free Cost Estimates   |   Furnace Contractors Directory   |   Furnaces Cost Report   |   Free Business Listing



All users of ProMatcher.com are subject to our terms of use.

Home   |   Articles & Videos   |   Affiliates   |   Networking Groups   |   Search by Category

Terms of Use   |   Privacy   |   Partner Network   |   Your Privacy Choices   |   About Us   |   Contact Us   |   Member Login

©2003-2024 - VentureStreet, LLC

Join Our Business Network